How Long Does a Pool Remodeling Project Take?
- Rosendo Diaz
- Jan 29
- 2 min read
If you're considering a pool remodel, one of the biggest questions on your mind is likely: How long will it take? Whether you're upgrading the pool’s surface, adding modern features, or doing a full renovation, understanding the timeline helps you plan accordingly.
At Aqua Blue Pool Resurface, we specialize in efficient, high-quality pool remodeling. While the exact duration depends on the size of your pool, scope of work, and weather conditions, here’s a general breakdown of what to expect.
Average Timeframe for Pool Remodeling
A typical pool remodeling project takes between 1 to 6 weeks, depending on the complexity of the renovations. Here’s a closer look at each stage of the process:
1. Planning & Permits (1-2 Weeks)
Before any work begins, you may need permits, depending on your city’s regulations. This step also includes design planning, material selection, and finalizing the remodeling contract. While some projects don’t require permits, structural changes or major upgrades often do.
2. Draining the Pool (1-2 Days)
Once the project begins, the first step is draining your pool. This typically takes 24 to 48 hours, depending on the pool size and local water drainage regulations.
3. Surface Preparation & Demolition (2-5 Days)
If your pool is being resurfaced with a material like Diamond Brite, the old surface must be chipped away and cleaned before applying the new finish. This phase includes:✔ Removing old plaster or tile✔ Repairing cracks or leaks✔ Prepping the surface for new finishes
4. Installing New Features (1-3 Weeks)
This stage varies significantly based on the scope of your remodel:
Resurfacing the Pool: 3-5 days
Tile and Coping Installation: 3-7 days
Adding Water Features (Waterfalls, Jets, LED Lighting): 5-10 days
Upgrading Equipment (Filters, Heaters, Automation): 2-5 days
5. Pool Refill & Chemical Balancing (2-3 Days)
Once all renovations are complete, your pool is refilled with water, and chemical levels are adjusted to ensure proper pH balance and water clarity. This process takes about 48 hours, depending on your pool’s size and local water pressure.
Factors That May Affect the Timeline
Weather conditions (Rain or extreme heat can delay work)
Permit approvals (Some cities have faster processing times than others)
Material availability (Custom tiles and finishes may require additional ordering time)
Project complexity (Basic resurfacing is faster than a full remodel with new plumbing or decking)
Plan Your Pool Remodel with Aqua Blue Pool Resurface
A well-planned pool remodel can be completed in as little as one week for basic resurfacing or up to six weeks for extensive upgrades. At Aqua Blue Pool Resurface, we ensure your project is done efficiently and professionally so you can enjoy your pool as soon as possible.
Ready to get started? Contact us today for a consultation and timeline estimate for your dream pool remodel!